Fast Fibre Networks

Over the last three years FMJ Solutions Ltd have become one of the leading independent civils contractors supporting the roll out of the Government fast fibre to the home initiative. We have now:

• Carried out excavations completing over 100,000 meters of trench
• Installed over 100,000 meters of ducting
• Installed over 3,000 duct chambers.
• Installed over 250 cabinets.
• Our works have provided the containment infrastructure to allow fibre to be installed to over 10,000 points.

We offer a turnkey solution and can carry out all excavations, installation of ducting systems and Fibre cabinet installations. We have the capabilities to carry out Fibre splicing and testing.

We provide competent teams to deliver safe, high-quality installations.

All our works are subject to stringent quality standards. Excavations and reinstatements are carried out to HAUC and end client specifications and have been fully inspected for compliance prior to handover to the client. Our competent teams have all required; CSCS, Streetworks, PIA, and plant accreditation (NPORS smart cards).

Teams are all well used to working within a highway’s environment, so ensure that all work is carried out within traffic management described in the Safety at Street Works and Road Works – A Code of Practice to ensure the safety of our operatives and the public, paying particular attention to vulnerable road users.

We are CHAS and Constructionline gold accredited, ensuring all SSIP and PAS91 procurement requirements are complied with.

Our successful fibre projects

Ipswich FFTH, July 2020 – completion expected March 2024

Project Value: £14.7M to date
Principal Contractor: VolkerHighways
Client: CityFibre

Ipswich was our introduction to the demanding fibre sector. We have installed 212km of trench on highways incorporating; modular, flexible and soft surfaces, road crossings across strategic roads have been carried out at night to avoid disruption to the travelling public. 9147 homes

Slough FFTH, January 2021 – expected completion date December 2022

Project Value: £7.8M to date
Principal Contractor: VolkerHighways
Client: CityFibre

Building on our successful delivery in Ipswich we were invited to carry out works in Slough. We have installed 110km of trench on highways incorporating; modular, flexible and soft surfaces. We have provided the containment infrastructure to connect 5394 homes.

Maidenhead FFTH, Dec 2021 expected completion date August 2022

Project Value: £6.5M to date
Principal Contractor: VolkerHighways
Client: CityFibre

We have installed 92km of trench on highways incorporating; modular, flexible and soft surfaces. We have provided the containment infrastructure to connect almost 4000 homes.

Contact

We can undertake and support all major civils works, nationwide, to ensure your fibre roll out is a success.